Stevens Lanes
Wesley J. Howe Center, Basement
Stevens Institute of Technology

   
Home

Hours
Rules and Information
Frequently Asked Questions

Renovations Information
Before Pictures
During Pictures
After Pictures

Behind the Scenes

Make a Reservation
Check the Calendar of Events

Bowling Alley Pizza Night
Bowling Alley Semesterly Parties

Bowling Alley Tournaments

High Scores of the Semester

Management
Become an Employee

Submit an Advertisement

Bowling Club's Site

Renovations Information

Click here for renovations pictures:  Before     During     After

Stevens Lanes is undergoing some major renovations this summer, which will be completed by the start of the Fall 2002 semester.  You'll notice a fresh clean new look and an all-around better bowling alley when the renovations are complete.

The renovations are being completed in three phases:

  • Cleaning of current equipment that will be kept.  This includes the lanes, the approaches to the lanes, the pinsetters, and the seats.  The walls will be painted and repairs to the bowling alley will be performed during this time.
  • Removal of old equipment and installation of new equipment.  This should occur sometime in the beginning of August, at which time balls, shoes, and pins that are no longer being kept will be thrown out.
  • Testing and setting up new equipment.  All of the new equipment needs to be tested thoroughly to be sure it performs correctly when the bowling alley reopens in the fall.

Items that are being kept:

  • Brunswick A-2 Pinsetters - new ball protection devices (to protect balls from being damaged) will be installed.  The machines will be cleaned well to ensure that balls and pins remain clean.
  • Brunswick power ball lift - the device that lifts the balls out of the ball return track is being kept, but the actual ball return housing and the rack where the balls are returned to are being replaced.
  • Synthetic lanes - the lanes are in excellent shape, but will be re-leveled and scrubbed.
  • Seats - the seats will be cleaned before the bowling alley reopens.
  • Lockers - the lockers will not be changed in any way.

Items that are being replaced:

  • Brunswick AS-K automatic scoring system - the entire scoring system will be replaced to make way for a modern scoring system, called Steltronic, to be installed.  This new system uses overhead monitors instead of lower console monitors that are in use now.  This system also has many more great features than the current system has, including the ability to store league information and create tournaments.
  • Brunswick 2000-series ball return hoods/racks, masking units, and foul detectors - the ball return lift itself will stay, but the rest of the ball return assembly will be replaced by a more modern looking one.  The masking units (the pictures that are over the pins) will be totally replaced, and will have a high-quality modern glow-in-the-dark image on them.  The foul detectors will also be replaced and will match the new ball return assembly.
  • Gutters and capping - all of the gutters, as well as the capping between the lanes and above the ball return track are being replaced with newer, more colorful ones.
  • The front counter is being repaired and will have new colors to match the new color scheme of the bowling alley.

New features of the bowling alley after the renovations:

  • A new stereo system will be available, including a CD player.  New speakers will also be installed above the lanes.
  • We will have two TVs installed, which will be connected to regular cable-TV and a DVD Player and VCR.  The scoring system's overhead monitors can also function as TV monitors for TV/DVD/VCR viewing.  The sound will be hooked into the new stereo system for extremely high quality sound!
  • Glow-in-the-dark pins, balls, and equipment will be in use.
  • Black lights, lasers, and theatrical lighting equipment are being installed for the cosmic/glow/laser light bowling nights.  More information about this will follow when the semester begins.
  • New network ports and electrical outlets for laptops will be installed.  Wireless access is also available.

Thanks to Andrew Syvertsen and Chi Yan for all of their hard work during the summer helping me out with the renovations.  Without them, this would not have been possible!!

 

If you have any questions or comments, please email us.